Technique

Workers taking turns: give the fastest worker every turn the rules allow

Quantitative Aptitude • Time and Work

Statement

If workers take turns one hour at a time, the work done is the sum of the work in each hour. To finish soonest, each hour should go to the fastest worker the rules allow. If no one may work two hours in a row, the fastest worker can take every other hour, and the others fill the hours between. The last hour may be needed only in part: time for it = work left that worker's rate.

How to use it

  1. 1Write each worker's work per hour, in units (take the job as the LCM of their times).
  2. 2Place the fastest worker in every hour the rules allow; fill the other hours with the next fastest.
  3. 3Add hour by hour until the work left is less than one hour's work.
  4. 4Finish with the fastest worker allowed in the next hour: minutes = work left rate 60.

Worked example

A can do a job in 4 hours and B in 6 hours. They work one hour each, in turn, starting with A. How long does the job take?

Step-by-step

  1. 1
    Job = 12 units. A does 3 units an hour, B does 2.

    Why: 12 is the LCM of 4 and 6, so both rates are whole numbers.

  2. 2
    Two hours (A then B) do units. After 4 hours: 10 units.
  3. 3
    2 units are left, and hour 5 is A's turn: hour = 40 minutes.

    Why: A does 3 units an hour, so 2 units take two thirds of an hour.

Answer

4 hours 40 minutes.

Watch out

The last hour is usually not a full hour; do not round it up. Also check who is allowed to work in the last hour: it may not be the fastest worker.