Skip to content
Technique

Time and work: call the whole job the LCM of the days, in units

Quantitative Aptitude • Time and Work

Statement

If A takes a days and B takes b days for the whole job, call the job LCM(a, b) units. A then does LCM a units a day and B does LCM b. Working together, the units per day add. Work done = units per day days, and work left = total work done. This avoids adding fractions.

How to use it

  1. 1Find each worker's days for the whole job; for example, a third in 6 days means the whole in 18.
  2. 2Take the job as the LCM of these days, in units.
  3. 3Units per day = total units days for each worker; add for workers together.
  4. 4Use units done = units per day days to fill in the missing part.

Worked example

A can do a job in 10 days and B in 15 days. They work together for 3 days, and then B finishes alone. How many more days does B take?

Step-by-step

  1. 1
    Job = LCM(10, 15) = 30 units. A does 3 a day, B does 2 a day.
  2. 2
    Together for 3 days: units.
  3. 3
    Left: units; B alone: days.

    Why: Only B is working now.

Answer

7.5 days.

Watch out

Adding the days instead of the daily work is the classic trap. Also, a part done in some days must first be turned into the whole job's days.

Also known as

LCM method for work, units of work, work done per day

Appears in past papers

2025

2024

2023

2021

2020