Procedure

Workers in a fixed turn order: find the work in one full round first

Quantitative Aptitude • Time and Work

Statement

If workers work in a fixed repeating order, one day each, the work done in one full round is the sum of each worker's work for one day. Take as many whole rounds as fit without finishing the job. Then add the next workers' days one at a time until the job is done. The day count is (whole rounds times days per round) plus the extra days.

How to use it

  1. 1Call the whole job a number of units divisible by every worker's days, so each day's work is a whole number of units.
  2. 2Stop the whole rounds before the job is done, then count the last days one by one: the job may end partway through a round.
  3. 3To name the weekday, count on from the first day: 7 days later is the same weekday.

Worked example

A can do a job in 4 days and B in 6 days. They work on alternate days, A first. On which day is the job finished?

Step-by-step

  1. 1
    Job = 12 units. A does 3 units a day, B does 2.

    Why: 12 is divisible by both 4 and 6.

  2. 2
    One round (A then B) does units. Two rounds do 10 units in 4 days.
  3. 3
    Day 5 is A's turn: , so the job ends on day 5.

    Why: 2 units are left, and A finishes them during day 5.

Answer

On the 5th day.

Watch out

Taking one round too many and overshooting, or forgetting that the last day may be only partly used, are the usual slips.